
Anza Storage Platform Release Notes
Table of Contents
- June 2025 Storage Platform Release
- April 2025 Storage Platform Release
- December 2024 Storage Platform Release
June 2025 Storage Platform Release
Download File Notes on the Compare page
- You can now view a supplier-authored note to any downloadable file. NDA-restricted files display a disabled Download button plus instructions on how to request access.
Bundled PCS Pricing Clarity
- The PCS Price column now reads “Included” instead of “–” for AC blocks with bundled PCS pricing.
Badges in Compare and Ranking Table
- We now show domestic content, architecture type, and Tier-1 badges in both the Compare page and Ranking table.
Select All / Clear All Filters
- Added “Select All” and “Clear All” to filters for one-click selection or clearing.
April 2025 Storage Platform Release
Ranking Table Improvements
Visual Enhancements:
- The ranking table now displays manufacturer logos, along with clear AC/DC system indicators and domestic content markers, so you can quickly understand the system type and compliance at a glance.
- A new tab, Supply and Counterparty, delivers enriched project planning data with fields for:
- Cell Factory Location
- Vertical Integration
- Global Manufacturing Capacity
- Operating Projects – North America
- Recent Average Project Size
Sorting and Filtering:
- Sort your table view by any metric across all tabs and columns.
- Choose from more than 30 filter options. These options include counterparty details, certifications, safety, technical specifications, supply data, manufacturer, model and domestic content.
Enhanced Analytics:
- We now display the estimated install acreage required to help assess system fit and site feasibility.
Comprehensive Comparison and Downloads
- Compare up to 4 system configurations side by side, featuring over 150 data points across technical, commercial, safety, performance, supply chain, counterparty, and execution categories.
- A dedicated download section offers files, including installation manuals, layout and mechanical drawings, project references, UL 1741 certificates.
- The IEEPA tariffs announced on April 2, 2025, and modified on April 9th, will be shown in the platform pricing at the time of release. A dedicated section on the Compare Page will detail the specific percentages each product incurs.
- The System Summary file can be found by clicking on the three dots next to the system on the Storage System Detail page.
Refine Financial and Engineering Assumptions
- Additional fields on the project creation page now allow you to refine assumptions and calculate storage configurations more accurately. Based on your feedback, we have introduced inputs that include:
- Adjustable Discount Rate
- ITC Analysis Toggle (include/exclude with an option to input additional cost basis)
- Toggles for including installation and EMS costs
- Advanced Capacity Maintenance
- Design Assumption Overrides
- Improved Reactive Loss Calculations
- Auxiliary Load Inclusions
Improved Cost Calculations
- Lifecycle cost calculations now factor in installation costs, ITC base benefits, and domestic content.
- Detailed cost breakdowns provide component pricing and cost per phase of the project to ensure a true apples-to-apples comparison.
Other Platform Updates
- A visual refresh of the Anza Home page now displays both solar and storage projects.
December 2024 Storage Platform Release
New Product Additions
Five new storage products have been added to the platform, bringing the total to 20 PCS models and 30 (19 DC and 11 AC) total battery products. Of these new products, 2 are manufactured in the U.S. and will help qualify the project for the domestic content bonus credit.
Pricing Updates
Pricing has been updated to reflect Section 301 tariffs for products delivered in 2026 and beyond. This change ensures transparency and accuracy in project cost projections.
- A price adjustment of 26% has been applied to Chinese products.
- Non-Chinese products have a price increase of 10-20%.
Engine Reliability and Run-Time Improvements
The latest platform enhancements include improved engine reliability and reduced run times for larger project simulations by up to 250%.
Explore these new features today to maximize your project’s value and streamline your development and procurement processes. For more details, reach out to our team or log in to the platform to get started.
The information herein, as well as other statements we make, contains forward-looking statements, such as predictions, projections, and/or information regarding the potential future functionality, offerings, and/or modifications to the Platform. Any statements that are not historical facts (e.g. the current offering and/or functionality of the Platform as of the date of such statement) are forward-looking. Such forward-looking statements are based upon management’s current assumptions and beliefs using the information currently available to it and are subject to various risks and outcomes that may cause actual results to differ than those expected. Such statements are not guarantees or promises of future functionality, offerings, and/or performance of the Platform, and you should not place reliance on such forward-looking statements. Anza assumes no obligation to update any forward-looking statements because of new information, future events, or other factors.
© 2025 Anza RE, LLC